TS 5000 ISM
Hold-open magnet wall installation For wall installation with base plate
- High retention force of 490N
- Concealed line-feed and robust design
For wall installation with base plate
Application Areas
- Use for hold-open angles up to 180°, ideal for exact holding open
- Use in harsh environments such as industrial buildings
- Places of public assembly and highly frequented sports venues
- Approved for GEZE hold-open systems
- Wall installation
Technical data
Hold-open magnet wall installation | |
IP rating | IP65 Magnet; IP20 connection |
Type of installation | Surface-mounted installation |
Line-feed | Top, bottom |
Area of application | Inside |
Downloads
Contact
We would be happy to assist you
+49-7152-203-0
Mo - Th: 7.30 a.m. - 5.00 p.m. / Fr: 7.30 a.m. - 4.00 p.m.
Hotline for architects
+49-7152-203-112
Mo - Th: 9.00 a.m. - 4.00 p.m. / Fr: 9.00 a.m. - 3.00 p.m.
Service Hotline
+49-1802-923392
(0.06 € / Calling from landline, mobile telephony max. 0.42 €)