Manual fanlight openers
OL 320 Surface-mounted fanlight opener with an opening width of 320 mm
- Achieves the full opening width of 320 mm for all leaf heights
- The opening width can be adjusted
- Little space necessary thanks to flat design of the scissors
- Safety button on the scissors shows scissors engagement in spherical head of leaf bracket
- Integrated leaf locking mechanism in the scissors ensures secure locking
- Scissor unhooking by pressing the release button facilitates window cleaning from inside and outside
- Unhinging inhibitor offers additional safety
- Lock carrier and additional locking mechanisms increase safety and air-tightness
- The scissors and the link arm can be installed from the front
- Leaf bracket fits all overlap heights and materials
Application Areas
- Convenient daily ventilation for rooms and staircases
- For windows with high leaf weights up to max. 250 kg
- Inward opening bottom-hung windows
- Automation by E 212 electric linear drive
- Installation on wooden, plastic or aluminium windows
- Frame installation
Technical data
| OL 320 | |
| Length | 436 mm |
| Depth | 65 mm |
| Height | 26 mm |
| Opening width (max.) | 320 mm |
| Leaf width (min.) | 680 mm |
| Leaf height (min.) | 400 mm |
| Leaf weight (max.) | 250 kg |
| Fitting stroke | 70 mm |
| Adjustable opening width (stroke reduction) | Dependent |
| Leaf locking mechanism integrated in the scissors | Yes |
| Scissor unhooking by release button | Yes |
| Unhinging inhibitor | Yes |
Downloads
Product shot
OL 320 open
LABELLING OBLIGATION:
© GEZE GmbH
OL 320 rectangled window (system)
LABELLING OBLIGATION:
© GEZE GmbH
Tender texts
Installation instructions
Product brochure
Environmental declaration
Installation drawing
Product data sheet
Variants & Accessories
Contact
We would be happy to assist you
+49-7152-203-0
Mo - Th: 7.30 a.m. - 5.00 p.m. / Fr: 7.30 a.m. - 4.00 p.m.
Architects/Modernization
+49-7152-9233-900
Service Hotline
+49-1802-923392
(0.06 € / Calling from landline, mobile telephony max. 0.42 €)