Link arm TS 4000 / 2000 Standard link arm
- Can be used up to 70 mm reveal depth with transom installation
Application Areas
- Right and left single-action doors
Technical data
Link arm TS 4000 / 2000 | |
Hold-open function | No |
Downloads
LABELLING OBLIGATION: © GEZE GmbH