Free swing door closer 1-leaf

TS 5000 EFS 3-6 Overhead door closer with guide rail for single leaf doors up to 1400 mm leaf width with electric free swing function

TS 5000 EFS 3-6 KM BS Gleitschienentürschließer für 1-flügelige Türen bis 1400 mm Flügelbreite mit elektrischer Freilauffunktion
  • Closing force with variable adjustment EN 3-6
  • Operating voltage 24 V DC
  • Can be used for right and left hand doors without conversion
  • Free swing function makes it possible to pass through the door with little physical force required
  • Comfort hold-open function locks the door at the end of the free swing area
  • External smoke switch control unit, whose signal closes the door automatically in the event of a fire
  • Hydraulic latching action which accelerates the door shortly before it is closed
  • Closing speed can be individually adjusted
  • Visual closing force display for easy control of the setting
  • All functions can be adjusted from the front
Contact us

Application Areas

  • Fire and smoke protection doors
  • Right and left single-action doors
  • Single-action doors up to 1400 mm leaf width
  • Door leaf installation hinge side and transom installation hinge side (different variants)
  • Hold-open systems with integrated hold-open function with free swing
  • Barrier-free access in accordance with DIN 18040

Technical data

TS 5000 EFS 3-6
Closing force in accordance with EN 1154 EN 3 - 6
Barrier-free in accordance with DIN 18040 up to leaf width (max.) in mm 1400 mm
Leaf width (max.) 1400 mm
Type of installation Door leaf installation hinge side
Opening angle (max.) 180 °
Input voltage 24 V DC
Suitability for fire protection doors Yes
Free swing area 85 ° - 160 °
Closing force adjustable Yes, stepless
Adjustable closing speed Yes
Latching action adjustable Yes, via valve
Back check integrated No
Position of closing force adjustment Front
Visual closing force display Yes
Hold-open function Electrically, for free swing function

Downloads

Variants & Accessories

Contact

We would be happy to assist you +49-7152-203-0 Mo–Thu: 7.30 a.m. – 5 p.m. / Fri: 7.30 a.m. – 4 p.m Hotline for architects +49-7152-203-112 Mo-Thu: 9:00 a.m. - 4:00 p.m. / Fri: 9:00 a.m. - 3:00 p.m. Service Hotline +49-1802-923392 (0.06 € / Calling from landline, mobile telephony max. 0.42 €)